Step 07 – T1 & Sampling

The lead time for T0 which we quote, usually starts from the approval on the tool designs till the first mold trial. We arrange sending you the T1 samples for approval in 3 working days, There is an inspection report with the Trial samples basis on the GT&D.

Step 06 – Tooling – Manufacturing

Mold Base and Mold Steel Partners

ASSAB(Sweden),DAIDO(Japan),FINKL(America),AUBERT & DUVAL(France), Thyssen (Germany), LKM (China)
Mold Base:
EMP,DME, HASCO, FUTABA, LKM.
Hot Runner:
MOULD MASTER, SYNVENTIVE, HASCO, DME, YUDO, INCOE
Standard Parts:
DME,HASCO,LKM,HEB,STRACK,OPITZ

Step 05 – Tooling – Tool Design

Basis on DFM we do provide you the 3D detailed Tool designs compatible with your selected moulding machine with in 3-6 days. This design contains all the features like gating / fasteners / cooling etc. Our team accompany you to review the tool design and concludes the tool design finalisation