Tail Lamp

CAD data provided by customer, Tool design Tooling – Double moulding Injection moulds Hot Runner Tip: Yudo (Korea) Core Ration through moulding machine Mould Life 1 million shots Cavitation L+R Lead Time for T1: 70 Days  

Travellers Tooth Brush

Concept Design, Product Styling, Engineering Details, Design review to moulding, Mock Up- Prototyping Part Material: BR003 with over moulding of TPE Tooling Type: Indexible Core pulling / Rotational Core for over moulding Mould life 15 Million shots Mould Material: S135 (Stavax) Number of Moulds: 13 (multi cavities) Lead Time: 50 Days