• CAD data provided by customer,
  • Tool design
  • Tooling – Double moulding Injection moulds
  • Hot Runner Tip: Yudo (Korea)
  • Core Ration through moulding machine
  • Mould Life 1 million shots
  • Cavitation L+R
  • Lead Time for T1: 70 Days