8 Horrible Mistakes you make while placing

injection moulds orders to Chinese Toolmakers

that can ruin your investment, delay your

production and completely kill your profitability​

asia@hongyijg.com

8883912346

FREE 2 HOURS CONSULTANCY AND GUIDANCE TO IMPROVE THE EXECUTION OF YOUR ENGINEERING PROJECT WORTH US$1500

8 Horrible Mistakes you make while placing

injection moulds orders to Chinese Toolmakers

that can ruin your investment, delay your

production and completely kill your profitability​

FREE 2 HOURS CONSULTANCY AND GUIDANCE TO IMPROVE
THE EXECUTION OF YOUR ENGINEERING PROJECT WORTH US$1500.

8 Horrible Mistakes with Chinese Toolmaker

Tool Maker
Selection

Experience the Excellence

Selection of Tool Maker for your project plays an important role to give you quality and cost effective product, otherwise much to lose in wrong selection.

Un-Productive
Time Loss

YOU LOOSE TIME IN MULTIPLE TRIALS

The major time loss in mould development is after T-0 trial, samples shipment 4-5 days, feedback 4-5 days,each trial you lose 15-20 days which affects your planning.

Project
Management

TAKING CARE OF FULLKITTING

An in-appropriate part design leads to lose much time to start tooling and after T-0 sample check multiple ECNs required and you have to pay modification cost.

Feedback
Mechanism

CONSIDER YOUR CURRENT FEEDBACK METHODOLOGY

The repeated problems in multiple trials will give an idea of your poor feedback system which will cause a major lose in time and cost.

Tool
Design

PLAN TO SUCCESS

If tool is not designed in a way to achieve problem free production. Your time will be lost in rectifications and adjustments of tool for production.

Tooling
Buy Off

STRONG INSPECTION METHOD BEFORE TOOL BUY OFF

The major time loss in mould development is after T-0 trial, samples shipment 4-5 days, feedback 4-5 days,each trial you lose 15-20 days which affects your planning.

Communication &
Co-ordination

Communication and Co-ordination

If there is any gap between you and tool maker for project understanding will result to major flaws in manufacturing of product and big cost to be paid.

Mould
Maintenance

HOW DO YOU TAKE CARE OF YOUR MOULDS

In case minor corrections required due to environmental changes, that will delay starting production on time which will cost you in terms of commitment failure.

Tool Maker
Selection

Experience the Excellence

Selection of Tool Maker for your project plays an important role to give you quality and cost effective product, otherwise much to lose in wrong selection.

Project
Management

TAKING CARE OF FULLKITTING

An in-appropriate part design leads to lose much time to start tooling and after T-0 sample check multiple ECNs required and you have to pay modification cost.

Tool
Design

PLAN TO SUCCESS

If tool is not designed in a way to achieve problem free production. Your time will be lost in rectifications and adjustments of tool for production.

Communication &
Co-ordination

Communication and Co-ordination

If there is any gap between you and tool maker for project understanding will result to major flaws in manufacturing of product and big cost to be paid.

Un-Productive
Time Loss

YOU LOOSE TIME IN MULTIPLE TRIALS

The major time loss in mould development is after T-0 trial, samples shipment 4-5 days, feedback 4-5 days,each trial you lose 15-20 days which affects your planning.

Feedback
Mechanism

CONSIDER YOUR CURRENT FEEDBACK METHODOLOGY

The repeated problems in multiple trials will give an idea of your poor feedback system which will cause a major lose in time and cost.

Tooling
Buy Off

STRONG INSPECTION METHOD BEFORE TOOL BUY OFF

The major time loss in mould development is after T-0 trial, samples shipment 4-5 days, feedback 4-5 days,each trial you lose 15-20 days which affects your planning.

Mould
Maintenance

HOW DO YOU TAKE CARE OF YOUR MOULDS

In case minor corrections required due to environmental changes, that will delay starting production on time which will cost you in terms of commitment failure.

We can help you with these problems.

0
YEARS OF EXPERIENCE
0 Countries
113 Clients
0 +
Crores of Investment being handled so far
0 +
Manufacturing Projects

Why choose HongyiJIG?

As a Complete Product development Company, we offer a complete “Art to Part Solution by not only delivering the molds at your doorstep rather taking care of your product DNA, engineering, Die mold commissioning and installation support as well. 

We Guarantee to Save your 70% development time after T-0 to tool buy off.

We provide complementary Part Design & Tool Engineering support.

Free Engineering support throughout the development until mold starts production at your factory.

Tool Buy of through 117 Checkpoints physically.

Our Customers
are Happy and willing to
talk about us.

Dr. K Kumar

Director – Nova Electronics

Shakeeb Shafi

Director – S R Industries

Services

We Provide Tooling Solutions

Commodity
Products

Automotive
Engineering

Auto
Lighting

Kitchen
Appliances

Home
Appliances

Medical
Equipement

Electronic
Enclosure

Copyright © Hongyijig Rapid Technologies Co. Ltd . All Rights Reserved